Work almost done
Beginning in 2014, the Massapequa Station was renovated with a longer platform and a pocket track added for storage. In July 2017, the pocket track has been added but work isn't completed. Signals haven't been installed yet.
Surprisingly, entry to the pocket track is only at Massapequa.