Merging of the Old Line and Metropolitan Subs
Notice the sign on the left at the end of the platform. The milepost on the Metropolitan Sub, 42.8, is also milepost 68.4 on the Old Line Sub. Old Line Sub numbering will continue west even though the tracks are part of the Metropolitan Sub until Weverton.